Construction

Construction
Construction of the Hilliard Road Bridge was finished in 1925. The bridge was built to reduce the traffic on the Detroit Rocky River Bridge as increased suburbanization caused greater traffic in and out of downtown Cleveland. In this photo, construction equipment can be seen on top of the bridge. | Date: 1925 | Source: Cleveland State Library Special Collections
Download Original File